Euphrates Pumping Station Refurbishment (E&I Construction) (WQ1, Apr–Aug 2023)
Installation of 400V LV switchgear, cabling, earthing, lighting, and small power distribution. Testing and commissioning of field instruments (flow meters, valves, gauges).